Add generator equipment 1 |
Add generator equipment 2 |
Air compression for building HVAC systems |

Cell Tower power feeds 1 |
Cell Tower power feeds 2 |
Commercial panels installation (2) |
Commercial panels installation |
Commercial plant add generator equipment |
Commercial plant add new equipment 2 |
Commercial plant add new equipment |
Commercial plant add roof exhaust |
Commercial plant generator equipment |
Commercial plant relocation LATH |
Compressor room fire detector |
Connect overhead crane |
Control equipment for explosive area production equipment |
Conveyor lines upgrade in a bakery plant (afterhours) 1 |
Conveyor lines upgrade in a bakery plant (afterhours) 2 |
Conveyor lines upgrade in a bakery plant (afterhours) 3 |
Core drilling |
Explosion rated production motor |
Gas detection install |
Gas detection on Plasma Welder |
High pressure actuator VALB 600 volts |
High pressure boiler control cabinet |
High Voltage Substation Maintenance 1 |
High Voltage Substation Maintenance 2 |
Install battery charger |
Install ground detection lighting |
Install new exhaust equipment |
Install new lighting |
Install new lights |
Install new power feeds for cell tower |
Install new roof for refrigeration equipment 1 |
Install new roof for refrigeration equipment 2 |
Install new roof for refrigeration equipment 3 |
Lighting repair |
Sewage TP gas detector |
Sewage treatment plant exposure rated gas detector |
Snow melting Ramp heating preparing |
Snow melting Ramp heating |
Working in a food plant freezer at minus 18 fahrenheit degrees |